# 0.32 Change Summary

> Balanced Exchange Framework (BEF) - Framework Version 1.0, 2026-08-22.
> Source of record: https://balancedexchangeframe.work/doc/v0-32

- Declared 0.32 the FIRST COMPLETE FRAMEWORK BASELINE while preserving the rule that Final 1.0 requires closure/transfer of applicable Conditions Precedent and no production use of unresolved HOLD functionality.

- Added a text-only BEF ARCHITECTURE AT A GLANCE showing the master triad and nested Exchange, LanaPays.us, Common Good, Alignment and OWN structures without reintroducing preliminary graphics.

- Rebuilt P03 around measurable current-cycle supply states: Split Release Supply, Open Flow Supply, Absorbed Supply and an exhaustion-based LANA Split Trigger.

- Closed CP-13 at framework-design level: a LANA Split follows exhausted/reconciled Open Flow Supply with no approved current-cycle replenishment pending; CP-13 continues as a per-Split evidence obligation.

- Separated trigger logic from growth sizing. Next-cycle release size and in-cycle registration amounts intentionally have no universal multiplier; they are adaptive, documented decisions based on live absorption, consumption, recirculation, infrastructure, Common Good and stability indicators.

- Added the Dosing Principle: release should track real absorption capacity and avoid over-supply, while P16 expressly prohibits using supply/registration/Split communication to manufacture false demand, misleading scarcity or manipulate an open market price.

- Carried the new Split logic into Core 4.6, P13, P14, Annex A definitions, CP-57 and the current-version evidence architecture, while preserving coin-specific P24 separation.

- Clarified that Price(n+1)=Price(n)x2 is the current LANA System / Reference Value transition rule and is separate from supply-size governance; corrected a fee-band typographical collision so MID remains EUR 0.01-EUR 0.30 inclusive and HIGH remains above EUR 0.30.
